Royal College of Surgeons, Dublin

The Tinnelly Group performed demolitions, temporary steelwork propping and bulk excavations to the RCSI extension in central Dublin.

Our works involved demolition of the existing carpark structures, then excavation of a deep dig basement adjacent to a former basement. Temporary steelwork propping was also inserted by The Tinnelly Group as the excavations progressed.

The Tinnelly Group excavated downwards with 2nr Liebherr excavators and deployed a long reach machine to retrieve the spoil and bring to ground level for disposal off-site. Once all steelwork was in place and the excavations were complete to the required formation level, The Tinnelly Group then brought in a 150t crane and craned our Excavators out of the basement back to ground level.

The bulk dig also contained different grades of inert and contaminated soil, which The Tinnelly Group managed and transported to the relevant licenced facilities. The Tinnelly Group are fully licenced to handle and transport all types of contaminated soils, and we worked closely with the geotechnical consultant on this project to ensure all the contaminated soils were handled correctly.

Demolition

Related projects

Cape Sierra Hotel, Sierra Leone, South Africa
Project

Cape Sierra Hotel, Sierra Leone, South Africa

Tinnelly Group under took the demolition of the former Cape Sierra hotel in South Africa.

Read More
Demolition of Blackrock Clinic
Project

Demolition of Blackrock Clinic

For this project there were a number of stages in order to complete the full demolition project. This project involved a range of demolition methods from man...

Read More
Demolition of Former Irish Street Stores, Wexford
Project

Demolition of Former Irish Street Stores, Wexford

Tinnelly Group undertook this month the demolition of former Irish Street Stores in Wexford. A 19th century landmark purchased by Wexford County Council in 2023...

Read More