Demolition of Eircom Building, Dublin

Tinnelly Group undertook the demolition of the Eircom Building back in 2005, taking it down to basement level to facilitate new works.

Prior to mobilisation of the high reach, the site was prepared with scaffolding and hoarding. The team stripped out the building and cleared the site of all debris, timber, stud work to walls and roof trusses using hand tools.

We completed investigative works at the severance line between the Eircom Building and The Gaiety Theatre.

A mobile crane was then used to remove mansard roof assisted by operatives wearing harnesses. As the mansard roof was removed the exposed walls to The Gaiety Theatre will be temporarily weathered using 1,000 gauge polythene fixed to the wall.

Floor slabs were demolished from roof downwards using mini diggers with rock hammer attachments, removing tri-shores as work progressed. Rubble was removed and disposed off. Sections of the floor were lifted out using the mobile crane and disposed off.

Our Liebherr High Reach was located to the court yard and commenced demolition of the structure taking it to ground level. Rubble was cleared and transported off site.

This was another project Tinnelly Group were proud to deliver.

Related projects

Demolition and Asbestos Removal at Irish Cement.
Project

Demolition and Asbestos Removal at Irish Cement.

Demolition and asbestos removal of Irish Cement, Drogheda.

Read More
Irish Sugar Factory, Carlow
Project

Irish Sugar Factory, Carlow

Tinnelly Group where tasked with the demolition of the Irish Sugar Factory based in Carlow, this project required planning from both our asbestos and demolition...

Read More
Demolition of Coca Cola Factory, Drogheda 2009
Project

Demolition of Coca Cola Factory, Drogheda 2009

Demolition of Coca Cola Factory, Drogheda 2009

Read More