Demolition Projects

Irish Sugar Factory, Carlow
Project

Irish Sugar Factory, Carlow

Tinnelly Group where tasked with the demolition of the Irish Sugar Factory based in Carlow, this project required planning from both our asbestos and demolition...

Read More
Demolition of the Hogan Stand, 1999
Project

Demolition of the Hogan Stand, 1999

Tinnelly Group where tasked with the job immediately after the 1999 All Ireland final to demolish the Hogan Stand to make way for the redevelopment of Croke Par...

Read More
Kilroot Coal Ship Unloader
Project

Kilroot Coal Ship Unloader

This project from July 2010 was the complete removal of the Continuous Ship Unloader (CSU) from the jetty at Kilroot Power Station. Kilroot Power Station is si...

Read More
Demolition of Doyles Bridge, Athlone.
Project

Demolition of Doyles Bridge, Athlone.

Demolition of Doyles Bridge, Athlone.

Read More
Demolition of Camlough Bridge – Flyover on A1 Bypass
Project

Demolition of Camlough Bridge – Flyover on A1 Bypass

The carriageway on the bridge structure was removed using demolition excavators. Once the carriageway and deck were removed the prestressed concrete beams formi...

Read More
Tara Towers
Project

Tara Towers

In 2019, Tinnelly Group carried out the site clearance, involving asbestos removal and complete demolition of the 7 storey, reinforced concrete frame structure...

Read More
National Gallery of Ireland, Merrion Square, Dublin
Project

National Gallery of Ireland, Merrion Square, Dublin

JTS were involved in major structural works at the National Gallery. As the building is a listed building the demolition works were extremely carefully managed

Read More
40 Molesworth Street Demolition
Project

40 Molesworth Street Demolition

Works at Nr 40 Molesworth Street involved; · The complete strip out of an existing office block back to shell, · Various Asbestos removals throughout the...

Read More
Miesian Plaza, Baggot Street, Dublin
Project

Miesian Plaza, Baggot Street, Dublin

The Tinnelly Group were awarded the structural demolitions package at the former Bank of Ireland Headquarters on Baggot Street Dublin.

Read More
74-75 Baggot Street Dublin Demolition
Project

74-75 Baggot Street Dublin Demolition

This project comprised of a 5 storey office block located in a busy urban location including its associated basement and podium car parks in preparation of deve...

Read More
Nr 1 Georges Quay, Dublin
Project

Nr 1 Georges Quay, Dublin

Main Contractor MAC conducted the overall refurbishment of Nr1 Georges Quay and appointed The Tinnelly Group to perform the extensive structural demolitions.

Read More
Croke Villas, Dublin
Project

Croke Villas, Dublin

The Tinnelly Group were appointed by Dublin City Council to perform the complete demolition of 3 x blocks of flats adjacent to the famous Croke Park Stadium.

Read More
Elm Park, Merrion Road, Dublin
Project

Elm Park, Merrion Road, Dublin

The Tinnelly Group have just completed works on a large structural alteration project at Elm Park, Dublin.

Read More
Former Smithwicks Brewery, Kilkenny
Project

Former Smithwicks Brewery, Kilkenny

The former Smithwicks Brewery located in Kilkenny city was de-commissioned and dismantled by The Tinnelly Group

Read More
Royal College of Surgeons, Dublin
Project

Royal College of Surgeons, Dublin

The Tinnelly Group performed demolitions, temporary steelwork propping and bulk excavations to the RCSI extension in central Dublin.

Read More
Paradise Street, Oxford City Centre, Oxford, UK
Project

Paradise Street, Oxford City Centre, Oxford, UK

JTS were appointed by McAleer & Rushe to perform the complete demolition of the Cooper Callas building, located in Oxford City Centre.

Read More
Former Passport Offices, 10 Molesworth Street, Dublin
Project

Former Passport Offices, 10 Molesworth Street, Dublin

Works involve the complete demolition of the former Passport Offices at Molesworth Street and excavation to a triple basement in preparation for a new office.

Read More
PepsiCo Cork
Project

PepsiCo Cork

This project incorporated the complete demolition of the existing concrete and steel structures at the decommissioned Swissco Factory and incorporated the remov...

Read More